Carlton Aerosystems

Client: Carlton Aerosystems

Location: Orchard Park, NY

Project Scope: Provided engineering study and design for a 23,000 SF ISO 8 clean room assembly area within this aerospace manufacturing facility.

  • Study criteria included ASHRAE requirements, particulate levels, pressurization gradients, and temperature and humidity stability​​​

  • Small air-handling equipment was added to improve heating and cooling capacity

  • High-efficiency remote condensing units were added to roof​

  • Placement of equipment allowed cutover and re-feed of existing ductwork distribution​​​

  • Temperature control was interfaced to the existing DDC building management system

Results: The project was completed within budget and on schedule, with no unscheduled production interruptions in the clean room space.